photo sharing and upload picture albums photo forums search pictures popular photos photography help login
Mike Rose | all galleries >> Galleries >> Mike's HO Scale Layout (Under Construction) > Making the Water Template
previous | next
02-JUL-2007

Making the Water Template

I had the cardboard to trace this out tonight, but need to buy some plywood to do it right. I'd like it to be one piece if possible. Putting this in place will allow me to create the rip rap embankment on the right, the seawall on the left, and the outlet of the under track culvert. Then I'll pour the plaster bed, paint it, and it'll be ready for casting resin. While I used pourable water for other places on the layout, this ledge will be something that might collect a soda can or two in an op session, I want it to be definitely non-soft!

Canon EOS 300D Digital Rebel
2s f/22.0 at 30.0mm iso100 full exif

other sizes: small medium large original auto
share
Type your message and click Add Comment
It is best to login or register first but you may post as a guest.
Enter an optional name and contact email address. Name
Name Email
help private comment