![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Once your dry fit is confirmed parallel, and all sides of the mushroom head sit flush on the hulls exterior you will need to do one more round of de-waxing of both hull and backing block.
After that is done you need to wax both the flange (not the backer block) and the thru-hull with copious amounts of mold release wax, butchers wax or even Collinite. The wax should be a paste type carnuba. After you have waxed it cut a scrap board to length and wedge the thru-hull into place. If you are on gravel or dirt lay a board on the ground to wedge the upright board against.
Contrary to popular belief you really do not need two people to install a thru-hull if you can be a little creative.
Full EXIF Info | |
Date/Time | 10-Apr-2009 16:13:10 |
Make | Nikon |
Model | NIKON D40 |
Flash Used | No |
Focal Length | 20 mm |
Exposure Time | 1/60 sec |
Aperture | f/4 |
ISO Equivalent | 200 |
Exposure Bias | |
White Balance | |
Metering Mode | matrix (5) |
JPEG Quality | |
Exposure Program | program (2) |
Focus Distance |
© All Images property of Compass Marine Inc.