Ausdrill RC drilling. Generally drilling hole depths of 40 - 100m for Grade Control purposes. The Difference between Resource drilling & Grade Control (GC) is primarily to do with coverage. GC drilling is done to a closer/denser pattern (6mX12m) and is the final interrogation of the orebody prior to defining the oreblocks that will then be dug by the shovels.