photo sharing and upload picture albums photo forums search pictures popular photos photography help login
A. J. deLange | all galleries >> Galleries >> brewery > IMG_0090.JPG
previous | next
14-FEB-2009

IMG_0090.JPG

Fermenter CIP: 1 pound of lye in 5 gal hot water are placed in small cylindroconical and pumped through check valve 'T', hose and stainless pipe to CIP spray ball in dome of fermenter. As small tank is emptied 3-way valve (connected to pump input) is thrown to connect pump input to line from fermenter drain thus establishing recirculation (this is the position shown in photo). At completion of recirculation pump is shut off and three way valves manipulated to drain fermeneter. Exhaustion is facilitated by compressed air (from yellow hose) admitted through spray ball. Lye is followed by hot water rinse and then recirculation of 200 mL of phosphoric + 200 mL nitric acid in 5 gallons of warm water in turn followed by cool water rinses.

Canon PowerShot SD870 IS
1/60s f/2.8 at 4.6mm iso200 hide exif
Full EXIF Info
Date/Time14-Feb-2009 02:04:34
MakeCanon
ModelCanon DIGITAL IXUS 860 IS
Flash UsedNo
Focal Length4.6 mm
Exposure Time1/60 sec
Aperturef/2.8
ISO Equivalent200
Exposure Bias
White Balance
Metering Modematrix (5)
JPEG Quality
Exposure Program
Focus Distance

other sizes: small medium large original auto
comment | share