Photo taken in August 2013. The Green River Trail is at right. This scene changed in 2014 when the Briscoe Levee was renovated-built. Most of the lhe levee work took place outside this view. Here, the one obvious change was the application of new asphalt. The paving at left is a loop trail in the park that re-joins the Green River Trail in the distance. Photographed during an examination of trail access points.