One 700 megawatt General Electric HP/LP turbine/generator set.
High Pressure turbines are on the left side while the crossover sends steam over to the larger, Low Pressure turbines. Generators are located on the back of both HP & LP turbines along with an exciter for each set. This is where the electricity is made.