To build the house way up on a very steep hil required eight weeks of ear splitting rock drilling. Our neighbors invited those of us surrounding the construction to thank us for our patience during the year and a half it took to build the house. You can hear the sound of the construction (only much lower in volume) here: http://www.pbase.com/isabel95/image/104305675