The Lot |
Existing structure before demolition |
Lot after demolition |
Wildflowers growing on our lot-Bloodroot |
Wildflowers growing on our lot-Trillium |
Front and Rear Elevations |
Main Level |
Pool Area/Landscape Plan |
Upstairs |
Side Elevations |
Day 6 - The Dig |
Day 8 - Ready To Pour Footing |
Day 17 - Footings Finished |
Day 21 - Basement Wall Forms |
Day 21 - Ready To Pour Basement Walls |
Day 30 - Foundation Walls Complete |
Day 30 - Foundation Walls Complete |
Day 30 - View From Inside Basement Looking To Left Rear |
Day 31 - Backfill |
Day 31 - Backfill |
Day 31 - Backfill |
Day 35 - Basement Slab |
Day 36 - Slab Complete |
Day 36 - Slab Complete |
Day 36 - Slab Complete |
Day 36 - Slab Complete |
Day 40 - Basement Framing |
Day 40 - Basement Framing |
Day 42 - First Floor Framing |
Day 42 - First Floor Framing |
Day 42 - First Floor Framing |
Day 44 - First Floor Framing |
Day 50 - Framing - Front Entry |
Day 50 - Framing |
Day 50 - Framing |
Day 50 - Framing |
Day 53 - Framing |
Day 53 - Framing |
Day 54 - Framing |
Day 56 - Framing Rear View |
Day 56 - Framing Rear View |
Day 56 - Framing Dining Room Window |
Day 56 - Merry Xmas From Our Outhouse To Yours |
Day 56 - Framing |
Day 58 - Framing nearly complete |
Day 58 - Framing nearly complete |
Day 59 - Rooftop Terrace |
Day 59 - View From Rooftop Terrace |
Day 59 - Isokern Fireplace Install, Family Room |
Day 59 - Master Bath |
Day 59 - Master Bedroom Fireplace Framing |
Day 60 Fireplace Hearth Support Detail In Basement |
Day 60 Fireplace Hearth Support |
Day 60 - Niche In Main Hallway |
Day 61 - Drilling Geothermal Ground Loops |
Day 61 - Stairwell |
Day 61 - Fireplace Nearly Complete |
Day 61 - Rear Of House/Chimney Now Just Visible On Tower |
Day 62 - Still Drilling... |
Day 62 - Fireplace |
Day 62 - Dining Room Ceiling Detail |
Day 62 - Master Bedroom Framing Detail |
Day 65 - Fireplace Brick Complete |
Day 65 - Roofing |
Day 65 - Geothermal Loops Complete...The Neighbors Are Happy They're Done |
Day 67 - Housewrap Complete |
Day 67 - Roofing Progressing |
Day 67 - Checking Out The Roofing Progress |
Day 72 - The Windows Arrive |
Day 72 - Dining Room Window Installation |
Day 74 - Fireplace In Master Bedroom |
Day 74 - Front Elevation With Windows Installed |
Day 79 - Master Bedroom With Windows Installed |
Day 79 - Waterfurnace HVAC In Basement |
Day 79 -Exterior View Of Master Bedroom With Windows Installed |
Day 80 - Rear Windows Installed |
Day 80 - Rear Windows Installed |
Day 81 - View From Living Room |
Day 96 - Low Voltage Rough-In |
Day 98 - Geothermal Ground Loop Connection |
Day 115 - Starting To Brick |
Day 115 - Icynene Insulation |
Day 117 - Icynene Insulation |
Day 123 - Exterior Brick |
Day 126 - Rear Retaining Wall Started |
Day 127 - Rear Retaining Wall Day 2 |
Day 127 - Rear Retaining Wall Day 2 View From Master Bedroom |
Day 128 - Right Rear Retaining Wall |
Day 128 - Right Rear Retaining Wall Complete |
Day 128 - Front Brick |
Day 130 - Front Brick and Granite |
Day 133 - Sheetrock Started - Dining Room Ceiling |
Day 133 - Sheetrock Living Room |
Day 133 - Exterior Granite |
Day 134 - Dining Room Ceiling |
Day 136 - Front Granite Complete |
Day 136 - Rear Granite Begun |
Day 138 - Living Room |
Day 139 |
Day 154 - Pool Excavation |
Day 154 - Pool Excavation |
Day 156 - Pool Plumbing Begun |
Day 156 - Front Brick/Granite Complete |
Day 157 - Pool And Breakfast Room |
Day 157 - Pool And Living Room |
Day 160 - Pool and Rear of House |
Day 160 - Pool Viewed From Terrace |
Day 160 - Pool - View of Upper Pool and Spillway into Lower Pool |
Day 163 - Pool |
Day 163 - Pool |
Day 163 - Pool |
Day 173 - Pool Tile Installed |
Day 173 - Rear of House |
Day 178 - Roof Beams Installed |
Day 200 - Dining Room Paint/Trim Nearly Finished |
Day 200 - Pool Area From Terrace Grading Complete |
Day 200 - Pool Area |
Day 207 - Window Film Removed |
Day 207 - Dining Room Window |
Day 207 - Window Film Removed |
Day 210 - Patio Walls Done |
Day 210 - Patio Walls Done |
Day 211 - Terrace Stainless Cable Railing Complete |
Day 211 - Terrace Stainless Cable Railing Complete |
Day 212 - Rear View |
Day 218 - Pool Bath Tile |
Day 218 - Master Bath Tile |
Day 218 - Rear View |
Day 221 - Master Bath Tile Grouted (Dark Slightly Blurry Areas In Center Is Something On Lens) |
Day 221 - Upstairs Bath Grouted |
Day 221 - Laundry Room Tiled |
Day 224 - Master Bath Vanity |
Day 225 - Hardwood Floor Installation Begun |
Day 225 - Hardwood Floor Installation Begun |
Day 225 - Hardwood Floor Installation Begun |
Day 225 - Concrete Patio Begun |
Day 225 - Concrete Patio Begun |
Day 226 - Patio Concrete Continues |
Day 226 - Patio Concrete Continues |
Day 226 - Garage Door Installation |
Day 226 - Hardwood Installation Library |
Day 227 - Patio Concrete |
Day 227 - Patio Concrete |
Day 227 - Checking Out Our Selection Of Outdoor Lighting Fixture |
Day 227 - View from Living Room Into Dining Room |
Day 228 - Patio Concrete Pour Finished |
Day 228 - Patio Concrete Pour Finished |
Day 228 - Patio Final Saw Cuts |
Day 228 - John By The Pool |
Day 232 - Rear View Morning Light |
Day 232 - Rear View Morning Light |
Day 232 - Gutters Installed, Driveway Graded |
Day 236 - Master Bath Tile |
Day 236 - Master Bath Tile Close-Up |
Day 239 - Driveway Retaining Wall |
Day 246 - Kitchen Cabinets And Island Installed |
Day 246 - Metal Fireplace Surround Installed |
Day 246 - First Trees Planted - Cryptomeria Left Rear |
Day 246 - First Trees Planted - Cryptomeria Right Rear |
Day 251 - Rear Landscaping Progress |
Day 259 - Marble Fireplace Surround And Hearth Installed |
Day 259 - Upstairs Bath Vanity And Sink Installed "Polar Cream" |
Day 259 - Upstairs Bath Vanity And Sink Installed "Statuary Marble " |
Night View Pool |
Night View Pool |
Back Yard |
Back Yard |
Front Of House |
Kitchen With Appliance Hutch Open |
Kitchen With Appliance Hutch Closed |
Breakfast Room |
Dining Room |
Living Room |
View From Main Hallway Into Dining Room |
Master Bath Shower And Tub |
Master Bath Vanity |