photo sharing and upload picture albums photo forums search pictures popular photos photography help login
strongmanmike2002 | all galleries >> Observatory and Equipment >> Previous observatories >> Observatories at Wallaroo 2012 to 2021 >> Wallaroo Observatory Stage III 2014 > Formatube form work for concrete support pier
previous | next
06-JUL-2014

Formatube form work for concrete support pier

The support pier will be formed in a single pour, the Formatube can be removed for the start
of the pour and along with the side access holes allow for easy access so the footing can be
filled, then the side hole covers will be replaced and screwed down and the forma tube can be
filled and the bolt pattern sunk in the top. This will have the entire footing and support
pier a single solid unit. The footing sits on bedrock too so it should be pretty solid.


other sizes: small medium large original auto
comment | share