Central Weber Sewer Improvement District--Plant Expansion Project, Ogden, Utah--Sept., 2009
![Aerial Image 8/17/09](https://a4.pbase.com/g1/14/728114/3/117062550.TNyPYydM.jpg) Aerial Image 8/17/09 |
![Directory](https://a4.pbase.com/g1/14/728114/3/117106598.MmbXqOnr.jpg) Directory |
![Clarifier, Primary 9/5/09](https://a4.pbase.com/g1/14/728114/3/117075744.pzsRJbjY.jpg) Clarifier, Primary 9/5/09 |
![Clarifier, Primary 9/5/09](https://a4.pbase.com/g1/14/728114/3/117073015.oAZaFZNp.jpg) Clarifier, Primary 9/5/09 |
![Headworks Floor 9/3/09-Placed 1,823 cubic yards(188 truck loads) of concrete in 11 hours](https://a4.pbase.com/g1/14/728114/3/117073692.spIM2Vh1.jpg) Headworks Floor 9/3/09-Placed 1,823 cubic yards(188 truck loads) of concrete in 11 hours |
![Headworks Floor 9/3/09-Placed 1,823 cubic yards (188 truck loads) of concrete in 11 hours.](https://a4.pbase.com/g1/14/728114/3/117074708.xDCydy7I.jpg) Headworks Floor 9/3/09-Placed 1,823 cubic yards (188 truck loads) of concrete in 11 hours. |
![Headworks Floor 9/3/090-Placed 1,823 cubic yards (188 truck loads) of concrete in 11 hours.](https://a4.pbase.com/g1/14/728114/3/117073681.jrqgiOTa.jpg) Headworks Floor 9/3/090-Placed 1,823 cubic yards (188 truck loads) of concrete in 11 hours. |
![Headworks Floor 9/3/09--Placed 1,823 cubic yards(188 truck loads) of concrete in 11 hours.](https://a4.pbase.com/g1/14/728114/3/117073685.7CBZsWRA.jpg) Headworks Floor 9/3/09--Placed 1,823 cubic yards(188 truck loads) of concrete in 11 hours. |
![Headworks Floor 9/3/09-Placed 1,823 cubic yards (188 truck loads) of concrete in 11 hours.](https://a4.pbase.com/g1/14/728114/3/117073694.wFbx3W6p.jpg) Headworks Floor 9/3/09-Placed 1,823 cubic yards (188 truck loads) of concrete in 11 hours. |
![Headworks Floor 9/3/09-Placed 1,823 cubic yards(188 truck loads) of concrete in 11 hours.](https://a4.pbase.com/g1/14/728114/3/117073697.OSEfmsNK.jpg) Headworks Floor 9/3/09-Placed 1,823 cubic yards(188 truck loads) of concrete in 11 hours. |
![Headworks Floor 9/3/09-Placed 1,823 cubic yards (188 truck loads) of concrete in 11 hours.](https://a4.pbase.com/g1/14/728114/3/117073699.UrmPX7MR.jpg) Headworks Floor 9/3/09-Placed 1,823 cubic yards (188 truck loads) of concrete in 11 hours. |
![Headworks Floor 9/3/09-Places 1,823 cubic yards(188 truck loads) of concrete in 11 hours](https://a4.pbase.com/g1/14/728114/3/117074710.BCMusXr8.jpg) Headworks Floor 9/3/09-Places 1,823 cubic yards(188 truck loads) of concrete in 11 hours |