photo sharing and upload picture albums photo forums search pictures popular photos photography help login
Mike Rose | all galleries >> Galleries >> Mike's HO Scale Layout (Under Construction) > Repaired Dust Bin
previous | next
21-NOV-2009

Repaired Dust Bin

One leg of the dust bin got damaged on the way back from the Craftsman Structure Show, so I repaired it with square styrene. This view also shows the railing on the other side of the elevator top.

Canon EOS 350D
5s f/22.0 at 100.0mm iso100 hide exif
Full EXIF Info
Date/Time21-Nov-2009 13:56:23
MakeCanon
ModelCanon EOS DIGITAL REBEL XT
Flash UsedNo
Focal Length100 mm
Exposure Time5.00 sec
Aperturef/22
ISO Equivalent100
Exposure Bias
White Balance
Metering Modematrix (5)
JPEG Quality
Exposure Programaperture priority (3)
Focus Distance

other sizes: small medium large original auto
share
Norm Wolf 21-Nov-2009 12:25
That brass rail looks great! Nice repair job on the Dust Bin too.
Type your message and click Add Comment
It is best to login or register first but you may post as a guest.
Enter an optional name and contact email address. Name
Name Email
help private comment