Our new home in Dunes West, Mount Pleasant, South Carolina

This is a pictorial record of the building of our new home from the start of construction in October, 2001. Although planning started two years earlier, construction commenced in October 2001. We purchased the property in May, 2000 and contracted with J. Hilton Googe for the design. The builder is Flander's Construction of Mount Pleasant - Charleston.
previous pagepages 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 ALL next page
A double Washingtonian Palm is planted in what will be an island in the lawn
A double Washingtonian Palm is planted in what will be an island in the lawn
One master bath mirror is put in place
One master bath mirror is put in place
The floor finisher makes his first sanding pass through the library
The floor finisher makes his first sanding pass through the library
Drillers begin work on 240 foot deep well for irrigation
Drillers begin work on 240 foot deep well for irrigation
Enhanced shot of well drillers at work  07/31/2002
Enhanced shot of well drillers at work 07/31/2002
Orlando fires up the air conditioners  08/01/2002
Orlando fires up the air conditioners 08/01/2002
Coel polishes the wood before applying the finish coat
Coel polishes the wood before applying the finish coat
Chad and Randy check the grading  08/07/2002
Chad and Randy check the grading 08/07/2002
With the first coat of finish,  the floor's character shines through
With the first coat of finish, the floor's character shines through
The floor receives a buffing between finish coats
The floor receives a buffing between finish coats
Coel applies stain to the stair treads
Coel applies stain to the stair treads
The front porch columns are paneled and ready for the railings
The front porch columns are paneled and ready for the railings