DSCF0009.jpgMost recent photo. Quay is torn down. Steel sheet will be driven in the hole.
The whole quay will be replaced by a temporaru steel sheet one. Later a 4 stories deep parking garage will be built in a part of the harbour. |
DSCF0009a.jpgAnother close up |
DSCF0010.JPGConstruction works are now developing, where a building of ca 80 m is to be erected. Pile driving is ready now |
DSCF0011.jpg(Former)Bank building will be kept, as it is on the municipal buildings list |
DSCF9804.jpgA total view |
DSCF9877.jpgBank building and work terrain. In the upper part of the building people live in appartments |
DSCF9877a.jpgThis was before the whole was dug. Crane is used for steel sheet drilling |
DSCF9878.jpgSlender crane |
DSCF9879.jpgSteel sheets ready to be drilled in the ground |
DSCF9880.jpgBoat has to go somewhere. Probably the ownder is unknown, as it lies there already 4ever |
DSCF9882.jpgA view from th other side, steel sheet is vibrated in the ground |
DSCF9883.jpgAnothher view |