< my HO scale models >
|
< FREMO USA HO-scale modules >
|
< construction of a HO-scale replica of the Santa Fe Railroad depot at Mountainair, New Mexico >
|
 level 1 (top) - to be scenicked |
 level 2 - to be scenicked |
 level 3 - to be scenicked |
 level 4 - staging only/no scenery |
 bridge segment of old layout |
 boxes full with rolling stock |
 the old set up in the new basement; soon to be changed drastically |
 first steps |
 Systems Operations Center |
 Mountainair is up! |
 stretching for Mountainair, NM |
 Paul setting up future Mountainair |
 happy switching on the old layout segments |
 laying trackbed for Mountainair |
 trackbed progress towards East Mountainair |
 smoothing the backdrop behind Mountainair |
 Which signal bridge? |
 East of Mountainair (behind it, really!) |
 checking out the new system |
 checking the roadbed |
 Amtrak on the 2% grade |
 Amtrak uphill |
 test train on new trackage |
 Mountainair and Broncho connected! |
 ATSF3751 made it to Broncho |
 test train at Abo - steam rounding Willard curve |
 seasoned operator |
 top: Abo station; below: Willard curve into Willard |
 first full (18ft) eastbound train arriving at Willard |
 top: Abo; below: Willard |
 eastbound ready to go down from Mountainair |
 Scholle (top) and Carnero |
 locos on the turnout at Scholle |
 eastbound light engines at Abo; Scholle in the background |
 upgrade at Abo (left) and down east of Mountainair |
 power boards |
 detectors and section control |
 more wiring |
 the C-YCCH rounds Willard curve |
 dispatcher screen at the SOC |
 looking east at Willard towards temporary staging |
 Willard house track looking west on level 2 |
 starting with Abo Canyon (left and back) |
 a Pelle Soeborg model |
 progress in Abo Canyon |
 Abo Canyon (left) - Abo and Willard (right) |
 roadbed for bridge #4 is in place; due to concrete walls it's curved backwards |
 first train snaking down the canyon |
 windows will receive lift-out backdrops |
 intermodal train crossing the site of a future bridge #1 |
 laying out the base for the helix |
 working on Sais |
 cutting roadbed for Sais |
 first train rounding the curve at Sais |
 top helix - now operational; 2%-grade, 32" minimum radius |
 Becker with test train - future site of signals and the old water tower |
 Sais above future Melrose |
 Bailey and East Vaughn now on the lower deck |
 Vaughn below Abo Canyon |
 Vaughn flyover laid out on the lower deck |
 testing the Faller car system, to be used for U.S.60 later |
 work in progress at Vaughn (lower level) |
 Golden Spike set Jan.1st, 2010 |
 eastbound intermodal train flying over the SP at Vaughn |
 Vaughn yard lead - stub at right is the SP connector |
 meet at Scholle |
 labeling |
 westbound manifest |
 eastbound stack on bridge #1 and 2 |
 checking the rails |
 Mr. Dispatcher |
 bridge #1 mock-up |
 bridge #1 and chaos |
 guest operators Elza and Michael Gross |
 Michael inspecting the stack train |
 airbrushing the backdrop at Scholle |
 white base level sprayed |
 on to the blue |
 adding blue skies |
 finished blue skies over Scholle and upper canyon |
 a painted backdrop makes a HUGE difference! |
 991-train taking the siding at Scholle |
 three levels |
 Belen - where the Harvey House will be |
 Belen Jct. on the lower level |
 Albuquerque reverse loop is in |
 wye for test and DCC-calibration |
 the loop area |
 Golden Spike ceremony |
 main area of progress |
 now added continuous running |
 side view - three laps to go |
 Belen yard on third level |