photo sharing and upload picture albums photo forums search pictures popular photos photography help login
Coleen Perilloux Landry | all galleries >> Bonnet Carre' Spillway Gallery > Spillway Structure Being Overhauled
previous | next
Spillway Structure Being Overhauled
6 August 2008 Coleen Perilloux Landry

Spillway Structure Being Overhauled

Montz end of Bonnet Carre' Spillway

All of the wooden "needles" of the Spillway structure are being pulled and stacked in order for the structure to be cleaned, painted and the rails repaired.
This is the simplest structure designed but works efficiently as it was designed to do.


other sizes: small medium large original
comment | share
John 09-Aug-2008 12:41
thanks for keeping us posted on the functions and goings on at the apillway site.. I am going to have to get out there again for some more pictures.. I am 38 yrs old and last year was the first year I have been up close to the spillway gates..(about 5 times I went to take pictures).,,, brought my one 4 year old son.. He wasnt very interested .. My six yr old son didnt even want to come so he stayed home.. John in Metairie
Scott Schexnaydre07-Aug-2008 17:32
So that is why the cranes booms were extended.