 Pad 2 before the cleaning started |
 The pavers are gone |
 The bushes in the middle are gone |
 Only the piers are left - next stop, cement! |
 First Pier is down |
 This one will be tougher |
 It's dug out, but pretty deep (Shawn Kelly photo) |
 Got the concrete broken (Shawn Kelly Photo) |
 Finally, it's out! (Shawn Kelly photo) |
 The frame is ready |
 What's next? |
 Holes for pier and electrical |
 Trenching for electrical and supports for the pier |
 Jerry takes a well-earned break |
 Electrical conduit and fitting the pier |
 Cutting conduit |
 Conduit in the trenches and Rebar |
 The post for the satellite dish |
 Rebar is done |
 Starting to pour concrete |
 Concrete |
 Concrete |
 Concrete |
 Concrete |
 Concrete |
 Concrete |
 Starting to smooth the concrete |
 Concrete |
 Concrete |
 Tamping the Concrete |
 Tamping |
 Smoothing |
 Inset and Level the Piers |
 Straighten the Satellite Post |
 Smooth the Concrete |
 Edging the Pad |
 Smoothing |
 Final Edging |
 Brushing the Final Texture |
 Protecting the Conduit |
 Protecting the Conduit and Names go on |
 Jim and the Ditch Witch - Trenching Begins |
 Ed Works on the Trench |
 The Trenching Crew |
 Jerry Waters the Trench |
 Framing is off the Finished Pad |
 The Trench reaches the Pad |
 Laying in the Elec Conduit |
 The Finished Pad |
 The Dish is up and Dome is ready |
 Satellite dish in place |
 The electrical box in place |
 The mount is seated and scope is ready to go |
 The Electrical Box |
 Getting the dome ready |
 Lifting the base of the dome into place |
 Placing the base |
 Making sure of placement |
 Checking for scope clearance |
 Checking clearance |
 Checking clearance |
 Scope in the dome base |
 Putting the dome top in place |
 Seating the dome top |
 The scope inside the dome |
 The dome looks ready |
 Checking the dome |
 Testing the dome |
 Rotating the dome |
 Everything is in place |
 Tim with the setup |
 The finished installation |