Headworks Floor 9/3/09-Placed 1,823 cubic yards (188 truck loads) of concrete in 11 hours.
The concrete for the headwoeks floor was placed from 5:00pm on September 3rd, 2009 to 6:30 am on September 4th, 2009. 1800 yards were placed (that's 190 truck loads of concrete).