Paul Higgins | all galleries >> Galleries >> Central Weber Sewer Improvement District--Plant Expansion Project, Ogden, Utah--Sept., 2009 > Headworks Floor 9/3/09-Placed 1,823 cubic yards (188 truck loads) of concrete in 11 hours.
previous | next
03-SEP-2009

Headworks Floor 9/3/09-Placed 1,823 cubic yards (188 truck loads) of concrete in 11 hours.

The concrete for the headwoeks floor was placed from 5:00pm on September 3rd, 2009 to 6:30 am on September 4th, 2009. 1800 yards were placed (that's 190 truck loads of concrete).