photo sharing and upload picture albums photo forums search pictures popular photos photography help login
Steve Carter | profile | all galleries >> Railroad >> Tacoma Trestle Construction >> First Half Construction tree view | thumbnails | slideshow

First Half Construction

The replacement to the Historic Milwaukee S-Curve bridge is a double track concrete and steel structure. So as to continue rail operations during construction, the new bridge was built approximately in two halves. The first half was constructed to the south of the trestle and included a short section of double track width bridge, where it would fit in the curve of the trestle it was replacing.
previous pagepages 1 2 3 4 5 6 7 ALL next page
14-IMG_3848.jpg
14-IMG_3848.jpg
15-IMG_3906.jpg
15-IMG_3906.jpg
16-IMG_3974.jpg
16-IMG_3974.jpg
17-IMG_3983.jpg
17-IMG_3983.jpg
18-IMG_3986.jpg
18-IMG_3986.jpg
19-IMG_3991.jpg
19-IMG_3991.jpg
20-IMG_3995.jpg
20-IMG_3995.jpg
21-IMG_4002.jpg
21-IMG_4002.jpg
22-IMG_4013.jpg
22-IMG_4013.jpg
IMG_3929.jpg
IMG_3929.jpg
IMG_1213-Edit.jpg
IMG_1213-Edit.jpg
IMG_1213-Edit-Edit.jpg
IMG_1213-Edit-Edit.jpg
previous pagepages 1 2 3 4 5 6 7 ALL next page