December work on the roof of the Cynwyd Station

In other news, another address for the Cynwyd Train Station: With utilities being hooked up...separate service for the first and second floor tenants...there is a need to differentiate the two locations.
The first floor has been assigned 375 Conshohocken State Road, and the second floor has been assigned 377 Conshohocken State Road.
Pole gutter and roof edge moulding
Pole gutter and roof edge moulding
All ready for the roofers on Monday
All ready for the roofers on Monday
Roof tile is ready to apply
Roof tile is ready to apply
The backs of some tiles are marked
The backs of some tiles are marked
First rows of roof tiles, and flashing below the pole gutter
First rows of roof tiles, and flashing below the pole gutter
Lining the pole gutter - Conshohocken State Rd side
Lining the pole gutter - Conshohocken State Rd side
On the railroad side, starting to place the roof tile
On the railroad side, starting to place the roof tile
Inside, work on the sprinklers continues
Inside, work on the sprinklers continues
Wrapped in blue, blanketed in snow
Wrapped in blue, blanketed in snow
Closeup of the long icicles hanging from the dormer roof
Closeup of the long icicles hanging from the dormer roof