Mister Max | profile | all galleries >> The Cynwyd Train Station and the Cynwyd Trail are on Track >> Cynwyd Train Station Revitalization >> August at the Cynwyd Station - Sewer Line, finishing touches tree view | thumbnails | slideshow

August at the Cynwyd Station - Sewer Line, finishing touches

Started installing the sewer line and ejector pump. It's the last major step, though all parties now have punch lists to complete before inspection.
previous pagepages 1 2 3 ALL next page
The trench is dug, pipe is laid and inspected, trench is filled. It runs almost to Conshohocken State Rd
The trench is dug, pipe is laid and inspected, trench is filled. It runs almost to Conshohocken State Rd
The excavation is filled and surfaced
The excavation is filled and surfaced
Another view of the exposed end of the pipe
Another view of the exposed end of the pipe
Looking down in the sump: Ladder, pump, chain & track to lower the pump
Looking down in the sump: Ladder, pump, chain & track to lower the pump
In the basement, the sewer line & electric line are caulked - and later cemented
In the basement, the sewer line & electric line are caulked - and later cemented
Next day, steel bollards and concrete are added
Next day, steel bollards and concrete are added
Concrete pad around the sump.  It's a few inches high to keep water from running in.
Concrete pad around the sump. It's a few inches high to keep water from running in.
Wiring the grinder pumps
Wiring the grinder pumps
Trench and pipe are in place up to Conshohocken State Road
Trench and pipe are in place up to Conshohocken State Road
Hole is dug in the middle of the street, exposing phone line boxed in wood, and water(?) pipe
Hole is dug in the middle of the street, exposing phone line boxed in wood,
and water(?) pipe
The main sewer line is way down there . . .
The main sewer line is way down there . . .
The next day, the street is blocked to connect to the main sewer line.
The next day, the street is blocked to connect to the main sewer line.
The connection is made and covered.
The connection is made and covered.
The sewer connection is complete!
The sewer connection is complete!