Barmouth Station, Cynwyd Heritage Trail |
closeup |
Two iron posts mark the old entrance to Westminster Cemetery |
One of the holes to sample the composition of the berm . . . |
Vine Creek appears! |
Vine Creek flows gently toward the Schuylkill |
A map of the pictures that follow |
First Inlet, on the left side of the trail, where the trail turns. |
The second inlet looks like a pillbox |
Outlet below Trail (file photo) |
A closeup of the outlet below the Trail |
The outlet from above the inlet where it goes underground again |
Outlet, from the shelf on the west side |
Outlet closeup, showing almost-hidden graffiti |
Cleggs Wall Lines #1 |
Clegg's Wall Line #2 |
Cleggs Wall Line |
The east-west wall from across Vine Creek to the east |
The same east-west wall from the near (west) side of Vine Creek |
The east-west wall, from below it on the west side of Vine Creek |
We placed and painted stakes in line with the wall on the west side |
Clegg's raceway, looking downstream |
The creek flows for a few dozen feet over a natural rock shelf |
In the raceway there is a concrete dam, reinforced by a steel bar. |
above the wall on the east side of the raceway, a hollow brick wall |
Wall on the east side of the raceway, built and later enlarged |
A wall of large stone, topped by walls of smaller stone. |
Closeup of the remnant of the perpendicular wall on the east side of the raceway |
We discovered this manhole above the slag wall east of the tunnel under the Reading RR |
Inside the manhole |
Here's the outlet at the mouth of Vine Creek, a dozen feet from the bank of the Schuylkill River |
Outlet at the Schuylkill River #2 |
Outlet at the mouth of Vine Creek, from Manayunk |
Work on the railroad by Norfolk Southern has made a mess on the Connelly plot. |
Scaffolding for guardrail construction on I-76 |
A brand new scaffold stair going up to the Pencoyd Viaduct of I-76 |
The Reading RR runs under I76, the Schuylkill Expressway |
a Conrail train on the Reading RR tracks at the Pencoyd Viaduct of I-76 |
Near the river, an abandoned flatcar |
Stenciling on the flatcar may lead to a more exact build date |
The construction workers have highlighted two old platforms |