I outlined the boomerang shaped piece of plywood in black so it's easier to see where the plywood was, and what was added. This gives me more "land" around the paved team track, and adds more heft to the land next to the abutment. The right side of the triangle will be an embankment down to the water as on the right side previously done, the straight section to the left of that and around the bend will be dock space done like on the right also. This was a big step to get out of the way, took an entire train night (the boomerang was done on the weekend), seawall is next.