photo sharing and upload picture albums photo forums search pictures popular photos photography help login
Mike Rose | all galleries >> Galleries >> Mike's HO Scale Layout (Under Construction) > After Trees
previous | next
11-DEC-2005

After Trees

This portal faces "north" with Binghampton in staging being to the right. It was tough to disguise due to the limited clearances against the wall. So it's a "blasted" rock portal, with the rock work above the SBD covered hopper being Sculptamold applied directly to the wall. Woodland Scenics clump foliage was glued above the rock with silicone sealer, along with shrubbery, to give a more 3D look and some depth to the flat. This mountain covers a major 90 degree bend in the plumbing drain above the tunnel liner.

Canon EOS 300D Digital Rebel
15s f/22.0 at 54.0mm iso100 full exif

other sizes: small medium large original auto
share
Type your message and click Add Comment
It is best to login or register first but you may post as a guest.
Enter an optional name and contact email address. Name
Name Email
help private comment