16-Apr-2014
Shackle hanger welded in place
After tring to put some extra weight on the front end, I found the location to weld the shackle hangers to the frame. After measuring both sides I ran a hot root pass and then a cover pass on the driver and passenger hangers.
16-Apr-2014
Ready for shackles
Once the paint on the shackles is dried then everything can be bolted back together.
17-APR-2014
Passenger side complete
The shackles are all greased up, bolts are tightened, and the weight of the Jeep is on the springs.
17-APR-2014
Drivers side complete
Now that both sides are complete it on to tackling the rear!
05-APR-2014
Frame reinforcements
The frame had cracks on the inside where the mounts bolted to so I welded all those up. Then I made plates to strengthen to outside of the frame.
05-APR-2014
Blasted and powder coated
With the motor painted and the motor mounted refreshed, it was time to bolt it all up.
06-APR-2014
New motor mount rubber
The old rubber mounts were wasted so new rubber was installed along with all new hardware.
06-APR-2014
Motor mounts installed
With the mounts having new rubber I'm hoping that they will last me a few years!
05-APR-2014
Brake booster painted and mounted
I painted the brake booster and master cylinder so tha I could get hem mounted. I used an oil/chemical resistant paint on the master cylinder and water pump.
05-APR-2014
Water pump installed
My water pump was fairly new so I cleaned it up and shot it with master cylinder paint from Eastwood.
05-APR-2014
Ready for assembly
Everything is painted and ready for assembly. But first the motor mounts will need to be addressed.
05-APR-2014
Rebuilt TBI
I rebuilt my TBI and mounted it to a new Performer manifold. I also blasted and powder coated all of the brackets that bolt to the manifold.