Noah and I started building his new train table just before the new year. After consulting some books, I bought my first saw, a bunch of lumber and we were off to the races. The table is 14x7 feet and is about 40 inches high. The framing was done with 2x4's and the top is .5 inch honasote on .5 inch plywood. Since it is so big and heavy, it is actually made-up of 4 different sections which are fitted together.

There are 3 independent loops of track on the table that will each have their own train. Our plan is to have at least 2 major mountains with tunnels, a small lake, and several urban scenes. Everything is hooked up during the building process because Noah likes to run the trains every day. There currently ins't an estimated time of completion, but we work on the table a little every day.

- Week of April 5th - working on mountain structure and interior mountain painting and tunnel siding

- Week of April 20th - Began plastering mountain

- December 09 - I can't believe it's been a whole year. I am sure someone with any skill and a strong work ethic would have had this table finished by now but they aren't working on my table. Plastering took a bit longer than expected and was quite an undertaking. The worst part by far was mixing plaster and rocks I made to form a paste to fill in all the gaps on the mountain. What a mess. Anyway, I got the hang of it after a while and with all the plastering done, I almost have everything painted and have actually started adding some underbrush and ground cover to some of the areas.

- Jan 26, 2010 - I have made a big push to finish this since X-mas and am only a few days away. Painting went fine but was stressful along the way. I had the room completely covered in plastic in case one of the spray bottles exploded. Ground cover also went well and looks pretty good. Parking lots are in and streets are basically all done. I am working on small parts now and trying to logically finish off the remaining sections without boxing myself in the center of the table.
My thinking spot
My thinking spot
Fence building has commenced
Fence building has commenced
Corner detail
Corner detail
Street striping underway
Street striping underway
Bed of lake is good just need to add water
Bed of lake is good just need to add water
Gas station is set
Gas station is set
Main street shaping up
Main street shaping up
Prime real estate
Prime real estate
Rock climber
Rock climber
Rock climber
Rock climber
Big Mountain exit
Big Mountain exit
Entrance of big mountain
Entrance of big mountain
Backside of big mountain
Backside of big mountain
One more view
One more view
The big mountain
The big mountain
Small mountain exit
Small mountain exit
Small mountain entrance
Small mountain entrance
Front of small mountain
Front of small mountain
The final version of the small mountain
The final version of the small mountain
My first attempt
My first attempt
The painting begins
The painting begins
More Main street buildings
More Main street buildings
The streets
The streets
The buildings on Main Street
The buildings on Main Street
The whole table
The whole table
The other corner complete
The other corner complete
One corner complete
One corner complete
Mountain base - aka - The Trailer Park
Mountain base - aka - The Trailer Park
Inside slope plastering and castings
Inside slope plastering and castings
Outside slope plastering
Outside slope plastering
The Train Table Buddha praying for a completion date
The Train Table Buddha praying for a completion date
CSX Coil Car
CSX Coil Car
Seaboard Boxcar
Seaboard Boxcar
Conrail Boxcar
Conrail Boxcar
Chessie Waffle Boxcar
Chessie Waffle Boxcar
Both mountains
Both mountains
This is the lake - I hope
This is the lake - I hope
Mountain two
Mountain two
Adding the rock castings
Adding the rock castings
Second mountain all plastered
Second mountain all plastered
The support beams for the top
The support beams for the top
Entrance to second tunnel
Entrance to second tunnel
Filling in all the gaps with a plaster/rock mix
Filling in all the gaps with a plaster/rock mix
One more mountain shot
One more mountain shot
Mountain close-up
Mountain close-up
The castings cemented onto the mountain
The castings cemented onto the mountain
The finished castings
The finished castings
The plaster in the molds somewhat level in a box of styrofoam
The plaster in the molds somewhat level in a box of styrofoam
The molds for the rock castings
The molds for the rock castings
Single Portals Entrance
Single Portals Entrance
Full view
Full view
Side View
Side View
Double Portal Entrance
Double Portal Entrance
Back of Mountain
Back of Mountain
Noah through the tunnel
Noah through the tunnel
Noah working with foam
Noah working with foam
One side complete
One side complete
Support for front of mountain
Support for front of mountain
Backside complete - plaster cloth will be attached directly to this
Backside complete - plaster cloth will be attached directly to this
Started adding heavyweight paper to form base
Started adding heavyweight paper to form base
Mountain with liners attached
Mountain with liners attached
Watching the train come through
Watching the train come through
Tunnel liners
Tunnel liners
This is awesome
This is awesome
What a view
What a view
A spot just for me
A spot just for me
Climbing through
Climbing through
Here I am
Here I am
Entrance hatch into Mountain - aka - Noah's entrance
Entrance hatch into Mountain - aka - Noah's entrance
CSX Diesel Engine
CSX Diesel Engine
TTX Boxcar
TTX Boxcar
CSX Boxcar
CSX Boxcar
CSX I-Beam Car with Wood Load
CSX I-Beam Car with Wood Load
Support structure
Support structure
CSX Coal Car
CSX Coal Car
 CSX Hopper
CSX Hopper
CSX Tank Car
CSX Tank Car
Support structure for first mountain
Support structure for first mountain
Painted and weathered double portal
Painted and weathered double portal
Painted and weathered tunnel portals
Painted and weathered tunnel portals
PLaying
PLaying
Watching them go
Watching them go
Noah working multiple trains
Noah working multiple trains
Portal painting station
Portal painting station
Wires, wires, wires
Wires, wires, wires
Inner loop and potential urban setting.
Inner loop and potential urban setting.
Bridges over the yet to be made river.
Bridges over the yet to be made river.
Middle loop track sidings.
Middle loop track sidings.
Outerloop decline.
Outerloop decline.
Track incline on outer loop.
Track incline on outer loop.
Outer loops set-up for Noah.
Outer loops set-up for Noah.
The new track on the table.
The new track on the table.
Noah discovers its train stuff!
Noah discovers its train stuff!
Anticipating the unveiling.
Anticipating the unveiling.
Testing the rigidity of the box.
Testing the rigidity of the box.
Noah loves when packages come to the house.
Noah loves when packages come to the house.
The train track arrives.
The train track arrives.
The complete benchwork for the table.
The complete benchwork for the table.
Purchased a saw and lots of lumber.
Purchased a saw and lots of lumber.
The first train set was set-up on the ping pong table.
The first train set was set-up on the ping pong table.