Well, if I am reading the inspection papers correctly, today marks the day that this structure has passed all
county inspections. Now it's on to a few minor "punch list" items and then one last payment to the contractor.
This shot shows Mars and Spica just above the roofline on the left and the Big Dipper above the treeline to
the right. The bright stars in the middle of the field are Arcturus (bottom) and Vega (top).
I've got the placed wired for remote control so I can control lights (even the color) and the garage door from my
computer or iPad / iPhone. It was cool to get notifications of when the construction crew was activating the door today.