12/22/2012 4:45PM - for winter solstice shading performance. System worked only off-grid, grid-bypass, or on generator at the time because the grid-tie wasn't commissioned yet; grid-tie was commissioned 2/10/2013. The larger panels are the flat plate collectors for the AET DX-120-96 solar hot water system.