26-OCT-2011
|
Cliff. Johnston |
Hawk House - Foundation
Pearland, Texas
The foundation beams have been leveled, the ground contoured so as to drain to the perimeter from the center and then to the far back corner, a semi-permiable fabric placed to prevent migration between the gravel and the sand/ground, the hardware cloth put in place and buckets of washed, pea gravel at the ready - obviously not enough. It took 54 buckets all totaled.