photo sharing and upload picture albums photo forums search pictures popular photos photography help login
house_vixen | profile | all galleries >> Readying a 1923 House for Rental tree view | thumbnails | slideshow

Readying a 1923 House for Rental

previous pagepages 1 2 ALL next page
Day 1: Deco Hardware, Back Bedroom
Day 1: Deco Hardware, Back Bedroom
Readying a 1923 Pacific NW house for rental
Readying a 1923 Pacific NW house for rental
Rental Reno: Day 1, Wall in-progress (LR with open, non-original front door)
Rental Reno: Day 1, Wall in-progress (LR with open, non-original front door)
Day 1:Chandelier & Acoustic Tile Ceiling
Day 1:Chandelier & Acoustic Tile Ceiling
Day 6: LR Wall--Light, Tunnel
Day 6: LR Wall--Light, Tunnel
LR to front [Glidden Family Legacy]
LR to front [Glidden Family Legacy]
Day 2: Opposite LR wall, with rectangular patching
Day 2: Opposite LR wall, with rectangular patching
LR to Kitchen, Final
LR to Kitchen, Final
Day 1: Grimy Sink Cabs aka Command Central
Day 1: Grimy Sink Cabs aka Command Central
Lower Kitchen Cabinets, Final
Lower Kitchen Cabinets, Final
Kitchen Day 1: Sink wall
Kitchen Day 1: Sink wall
Kitchen Sink Wall, Final
Kitchen Sink Wall, Final
Kitchen Day 1: Avocado Appliances
Kitchen Day 1: Avocado Appliances
Red side of kitchen [Behr Cherry Cobbler]
Red side of kitchen [Behr Cherry Cobbler]
Deco Cabinet Hinge
Deco Cabinet Hinge
Days 4-7: Shiny Hardware
Days 4-7: Shiny Hardware
Cabinet Latch
Cabinet Latch
Day 1: DR to kitchen
Day 1: DR to kitchen
DR to kitchen, Final [S Williams Baize, though not SW paint (sob!)]
DR to kitchen, Final [S Williams Baize, though not SW paint (sob!)]
Day 1: DR to Sliding Doors
Day 1: DR to Sliding Doors
Kitchen to DR, Final
Kitchen to DR, Final
DR corner leaded glass cabinets, Final
DR corner leaded glass cabinets, Final
Day 1: Front Bedroom at Noon w/Overhead Lighting  (LR through door)
Day 1: Front Bedroom at Noon w/Overhead Lighting (LR through door)
Day 1: Front Bedroom at noon
Day 1: Front Bedroom at noon
Day 7:Front bedroom at noon, walls & trim done  [Behr Ripe Wheat]
Day 7:Front bedroom at noon, walls & trim done [Behr Ripe Wheat]
Day 2:  Semi-Before Front Bedroom--Millwork Emerges
Day 2: Semi-Before Front Bedroom--Millwork Emerges
Front Bedroom, Final (little ensuite bath through door on right)
Front Bedroom, Final (little ensuite bath through door on right)
My least favorite room: Front BR's bathroom with PO's choices
My least favorite room: Front BR's bathroom with PO's choices
Day 1: Back Bedroom, Double Windows
Day 1: Back Bedroom, Double Windows
Day 17: Back Bedroom: What a difference a ton of labor makes.... [Glidden's Desert Floor]
Day 17: Back Bedroom: What a difference a ton of labor makes.... [Glidden's Desert Floor]
Back Bedroom's Windows, Final
Back Bedroom's Windows, Final
Day 1: Back Bedroom (DR to left, tiny PR to right)
Day 1: Back Bedroom (DR to left, tiny PR to right)
Day 14: Back Bedroom Closet
Day 14: Back Bedroom Closet
Day 1: Back Bedroom's tiny ensuite PR
Day 1: Back Bedroom's tiny "ensuite" PR
Day 16:Teeny PR Gone, and nothing but chaos in its place (from Back BR)
Day 16:Teeny PR Gone, and nothing but chaos in its place (from Back BR)
Day  21: PR No More! (reno-in-progress w/ mocked-up fixtures)
Day 21: PR No More! (reno-in-progress w/ mocked-up fixtures)
Day 43 (pant pant): 5 x 8 Cabana Bath, BR entrance [Behr's Ripe Wheat]
Day 43 (pant pant): 5 x 8 Cabana Bath, BR entrance [Behr's "Ripe Wheat"]
Day 1: Ghost of Rehab Past/Bathroom- to-be
Day 1: Ghost of Rehab Past/Bathroom- to-be
Day 16: Cooling Cabinets revealed (see unpainted portion)
Day 16: Cooling Cabinets revealed (see unpainted portion)
Day 40: Cooling Cabinet, Reinvented
Day 40: Cooling Cabinet, Reinvented
previous pagepages 1 2 ALL next page