On April 11, 2008, a plumber working in an office directly above our offices cut a major water line that hadn't been shut off. There were reports of up to six inches of water on the floors above us. The break was almost directly above our server room but fortunately the firewalls (physical walls in this case) mostly protected it. This is what happened to the rest of the office. The first five image s are from Friday, when the break occurred. The rest are from the Monday after, and show the big blowers the clean-up crew had running.