Some images were set darker than usual to bring back blown-out white areas on the wing wrapping. The two wing sections being delivered from the New Zealand builder are the top and bottom sections of the front of the complete four-section wing. The top and bottom rear sections were built on-site at Oracle's base at Pier 80 in San Francisco, where all these photos were shot. The other sections being delivered are the front and rear cross-beams, which will connect the two hulls, which are also being built at Pier 80. The boat will be assembled at Pier 80, as per the AC rules, which allow components to be built elsewhere, as long as final assembly is done in the challenging or defending team's nations.