Big Earth Works

By Sunday 08-02-2004 the absorption trenches had been completed and inspected. The process of covering the top soil overburden with burgan branches for erosion protection was under way. The tramway had been pulled up, and a new zig-zag path had been installed at the bridge end of the house to provide machine access from the front porch to the back porch level. A 12 tonne excavator and a "tracked Bob Cat" spent Wednesday 03-03-04 and Thursday 04-03-04 excavating for and installing the septic tank, and excavating for the sand filter.

This gallery shows the work from that point to the completion of the Waste Water System.

Richard.

PS: these images are scanned from film prints.
previous pagepages 1 2 3 ALL next page
more screenings
more screenings
buried
buried
little evidence
little evidence
distribution pit
distribution pit
CFA outlet
CFA outlet
outlet installed
outlet installed
house site excavation begins
house site excavation begins
soil transfer
soil transfer
house site
house site
creating space
creating space
at ground zero
at ground zero